In Newington. CT176 (Main St.) S. 1.5 miles from jct with CT175 (Cedar St.), E. on Churchill Rd. 0.15 miles to the bridge. Pedestrian walkway on both sides.
It is named: Churchill
and is over the Schoolhouse Brook.
This piece measures 13-1/4" (33.7 cm) x 10-7/8" (27.6 cm) and was
vacuum pressed
onto a piece of 1/2" Balsamic Birch plywood. It is backed by a single piece of
Jarrah Burl
veneer.
It was sanded with 120/600 grit then 5 coats of sanding sealer
were applied. Between each application the surface was
sanded with 600 grid using a flat sanding block. It was finished with
3 coats of Satin, wipe on polyurethane varnish and finally polished with
Renaissance wax.
It is all Scalpel cut. |
/